Domain Interchange works - February to April 2013

Domain

Domain Interchange will soon have a new look, with major redevelopments over the Easter holidays set to turn it into Melbourne's latest accessible stop.

This important upgrade will facilitate improved and safer access to tram services for passengers, with the addition of two, double-sided, level access platforms and a dedicated tram track for the Route 8 service into Domain Road. Other improvements include additional pedestrian crossings and new dedicated bicycle lanes on St Kilda Road.

Tram service changes will be in place from first tram Friday 29 March to last tram Thursday 11 April.

A letter has been distributed to local residents and traders detailing the works schedule and tram service changes.

Location of major works with tram service changes

2013 Domain Interchange Works Map

The major works will be carried out in two stages:

Stage

Date & Time

Traffic management

Noise level

Nature of works

1: Major Works

(5 days)

12 am Friday 29 March to 12am Wednesday 3 April
(24 hours a day)

Full road closure, detours in place.

All footpaths will remain open during the works to ensure pedestrians access to all businesses and properties.

Traffic controllers on duty to assist motorists and pedestrians

High to very high

Cutting of existing rail & saw cutting of concrete.

Breaking out and removal of concrete and existing rail, including loading of broken concrete onto trucks.

Construction of new tracks, pavements, overhead infrastructure and traffic signals.

2: Major works

(9 days)

12am Wednesday 3 April to 5am Friday 12 April (24 hours a day)

Partial road closure including Domain Rd and Park St (2 lanes south/north bound).

Traffic controllers on duty to assist motorists and pedestrians.

High

Construction of new tracks, platform stops, overhead infastructure and traffic signals.

Asphalting and road works.

Tram service changes from Friday 29 March to Thursday 11 April

Route 8 trams will operate as 8a. Services to Toorak will terminate at Stop 19 Dorcas St. Services to Moreland will terminate at a temporary stop in Domain Rd near St Kilda Rd.

Route 3, 5, 6, 16, 64, 67 and 72 trams will operate as Routes 3a, 5a, 6a, 16a, 64a, 67a and 72a. Services from the city will terminate at Stop 19 Dorcas St. Services to the city will terminate at Stop 21 Bowen Cr.

Passengers can connect between the two sections by walking approximately 300 metres.

Route 55 trams will terminate at Stop 119 Park St.

Route 1 will operate normally.

Please note that once the works are complete, Stop 119 Park Street/St Kilda Road will be removed.

12176 YTM Domaine Interchange Traffic Detour _Low Res _FA

 

Contact us

For train, tram and bus information call 1800 800 007 (6am-midnight daily) or visit ptv.vic.gov.au.

Yarra Trams welcomes customer feedback on 1800 800 007 (6am - midnight daily)

For the tram service changes between 7am and 7pm Monday to Friday, follow us on Twitter @yarratrams

TramTracker logo
Android App
iPhone App
Tramtracker Website App
Journey Planner logo
at  :